Located on a high-traffic dual carriageway adjacent to Birmingham Airport, this development brings the 46th site in the EG On The Move network to life—featuring a sizeable convenience store offering, EV charging infrastructure and a premium Starbucks drive-thru.
AKN Build was appointed to deliver the civil and infrastructure package for the EG On The Move scheme—transforming the site into a fully serviced petrol forecourt alongside retail and foodservice elements. As Principal Contractor, we coordinated enabling works, drainage, external works and structural foundations to support the Starbucks facility and the overall service station layout.
Key works
- Site establishment, setting-out and earthworks to form the forecourt and retail pad
- Drainage, manholes, separators and attenuation tied into local network
- Utilities: service ducting, chambers, metering and connections for dual-use site
- Slab works, plinths, and skids prepared for the Starbucks drive-thru pod and tenant plant
- External works: access roads, kerbs, car-parks, surfacing, bay markings and signage plinths
- Coordination with Starbucks-brand fit-out specialists and live-site phasing
Delivery highlights
- Branded delivery: Installation aligned with Starbucks drive-thru design standards and EG On The Move’s service station platform.
- Complex sequencing: Works executed within a live highway/airport-adjacent zone with minimal disruption.
- Quality & compliance: Full testing, certification and as-built documentation delivered at handover.