Located in Brinsworth, Rotherham, this project delivered a new jetwash facility at an existing Esso service station, providing customers with a high-quality, efficient wash bay that complements the forecourt’s fuel and retail offering. The installation was completed within a live trading environment, planned to ensure safe operation and minimal disruption to daily site activity.
AKN Build provided full design, civils, and installation services, managing every aspect of the jetwash construction. From ground preparation to final commissioning, all works were completed to Esso’s brand standards and environmental compliance requirements.
Key works
- Site establishment, excavation, and ground formation
- Construction of reinforced concrete bay and plant foundations
- Installation of drainage and interceptor systems for water recycling
- Supply and installation of jetwash plant, pipework, and control equipment
- Electrical connections, power distribution, and control integration
- Kerbing, surfacing, and protective bollards
- Signage, lighting, and customer safety enhancements
- Final testing, commissioning, and handover documentation
Delivery highlights
- Live forecourt delivery: Sequenced and managed works to maintain safe customer and vehicle access throughout.
- Environmental compliance: Installed interceptors and water management systems to meet current discharge regulations.
- Quality and reliability: Delivered a durable, high-performance jetwash bay designed for long-term operational efficiency.
