Located beside the landmark Stadium MK, this twin-unit development for Burger King and Costa Coffee brings two leading quick-service brands to one of Milton Keynes’ busiest leisure and retail destinations. Positioned to capture traffic from the A5 and the wider retail park, the site provides high-quality, convenient food and beverage options serving matchday visitors, commuters and local residents.
AKN Build delivered full civil and infrastructure works for both drive-thru units, transforming the brownfield plot into a fully serviced site ready for vertical construction and brand fit-outs. Our scope included site preparation, drainage, utilities, forecourt and access roads, with precise coordination to accommodate two separate tenants and ensure safe operation across the shared site.
Key works
- Site establishment, ground profiling and formation levels for both units
- Drainage, attenuation and interceptor systems integrated with existing network
- Service ducting, chambers, metering and utility connections for dual occupancy
- Foundations, slabs and plinths for Burger King and Costa Coffee drive-thru pods
- External works including kerbing, surfacing, bay markings and pedestrian routes
- Drive-thru lane formation, signage bases and lighting foundations
- Landscaping, boundary treatments and car-park layout
Delivery highlights
- Dual-brand coordination: Sequenced design and civils to suit two operators under one development programme.
- Live-environment delivery: Managed construction safely within a busy retail and leisure zone adjacent to Stadium MK.
- Programme certainty: Works completed to enable timely tenant fit-out and trading ahead of peak event season.
- Quality assurance: All testing, certification and as-built documentation issued at handover.
